Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News Editorials & Other Articles General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

Sherman A1

(38,958 posts)
Sun Mar 27, 2022, 05:14 PM Mar 2022

U.S. to Hold Offshore Wind Lease Sale for Two Areas in the Carolinas

The U.S. will hold a wind energy auction for two lease areas offshore the Carolinas on May 11, the U.S. Department of the Interior said Friday, as the Bureau of Ocean Energy Management (BOEM) has completed its environmental review.

The lease areas cover 110,091 acres in the Carolina Long Bay area that, if developed, could result in at least 1.3 gigawatts of offshore wind energy, enough to power nearly 500,000 homes, the Department of the Interior said.

"The Biden-Harris administration is committed to supporting a robust clean energy economy, and the upcoming Carolina Long Bay offshore wind energy auction provides yet another excellent opportunity to strengthen the clean energy industry while creating good-paying union jobs,” said Secretary Deb Haaland. “This is a historic time for domestic offshore wind energy development. We will continue using every tool in our toolbox to tackle the climate crisis, reduce our emissions to reach the President’s bold goals, and advance environmental justice.”

https://www.marinelink.com/news/us-hold-offshore-wind-lease-sale-two-495324

1 replies = new reply since forum marked as read
Highlight: NoneDon't highlight anything 5 newestHighlight 5 most recent replies
U.S. to Hold Offshore Wind Lease Sale for Two Areas in the Carolinas (Original Post) Sherman A1 Mar 2022 OP
no fuel required to kick out the watt-hours Blues Heron Mar 2022 #1

Blues Heron

(6,211 posts)
1. no fuel required to kick out the watt-hours
Sun Mar 27, 2022, 05:47 PM
Mar 2022

brilliant. No carbon, no mining, no drilling, no spilling, no nuclear waste. Fuel wise that is.

Of course there is a carbon cost to build the turbines, lay the cable etc. Just like any other industrial scale power generation system.

Latest Discussions»Region Forums»North Carolina»U.S. to Hold Offshore Win...